Road Closure

UPDATE:  Due to the rainy/snowy weather this week the road construction in the 100 block of North Seventh Street has been postponed.  The construction is now scheduled for the week of 12/16/19.

The 100 block of N Seventh Street will be closed starting today, December 6, 2019 for approximately two weeks for road construction. This is the block between Walnut Street and Chestnut Street. Access to this block will be limited to local residents living on this block and emergency vehicles.   The construction will be on the storm drain system. Thanks for your patience during this project.